Glimmerskarð Street 2–6 – Hafnarfjörður
- Three two-storey townhouses, each with 6 to 8 rooms. An in-house development project.
- 2024–2025
Lambamýri 1–6 – Álftanes
- 84 apartments in six low-rise buildings, together with retail premises. In-house development project.
- 2023–2026
Lindarbrún – Hveragerði
- 18 sustainability-certified apartments in low-rise residential clusters. Retail premises. Contract project.
- 2022–2024
City Hub – 46 Hverfisgata Street
- Rebuilt and fitted out as an accommodation property for 186 guests. In-house development project.
- 2023–2024
Grænaborg 16 – Vogar on the Vatnsleysuströnd Coast
- A 24-apartment residential building at Grænaborg 16 in Vogar, on the Vatnsleysuströnd coast. The project was carried out under a cost-plus construction contract.
- 2022–2024
Hallgerðargata Street 18
- A townhouse with three apartments across three floors. In-house development project.
- 2022–2023
Hafnarbraut Street 12 – Kársnes
- 129 apartments together with two underground parking garages, built under contract for Upphaf ehf. (Ltd.).
- 2020–2022
Stuðlaskarð 6 – Hafnarfjörður
- 6 townhouses together with service facilities, built under contract for the National Association of Intellectual Disabilities.
- 2021–2022
Ægisgrund 3 & 5 – Garðabær
- 2 detached houses built under contract. Timber houses on concrete foundations.
- 2021–2022
Hallgerðargata Street 2–16 – Reykjavík
- 80 apartments together with an underground parking garage, built under contract for Bjarg Housing Association.
- 6,821 square metres
- 2019–2020
Nónhamar 8
- 20 apartments, contract project.
- 2020–2022
Beykiskógar 17 – Akranes
- 5 apartments together with service facilities, built under contract for the National Association of Intellectual Disabilities.
- 371 square metres
- 2020
Stillholt Street 21 – Akranes
- 37 apartments together with a parking garage. In-house development project.
- 5,768 square metres
- 2018–2020
Elliðabraut Street 4–10 – Reykjavík
- 83 apartments. In-house development project.
- Underground parking garage and private garages.
- 2019–2022
Faxagarður 1 – Reykjavík Harbour
- 184-square-metre distribution station, public tender project.
- 2020
Fiskislóð Street 37C – Reykjavík
- Construction of a new neighbourhood service centre for the City of Reykjavík, public tender project.
- Environmentally certified by BREEAM.
- 2018
Korputorg – Reykjavík
- Contract project carried out for ISAM at Korputorg.
- Interior renovations for the Myllan bakery production facility.
- 3,200 square metres
- 2018–2019
Suðurlandsbraut Street 8 – Reykjavík – Vodafone
- Interior reconstruction and modifications for specialised operations. Contract project.
- 2018
Brynjureitur Development – Reykjavík
Hverfisgata Street 40–44 / Laugavegur Street 27A & 27B
- 72 apartments, restaurants, and retail spaces. In-house development project.
- 6,620 square metres
- 2016–2019
Grandavegur Street 42 – Reykjavík
- 141 apartments and a two-storey parking garage. In-house development project.
- 26,617 square metres
- 2014–2019
Hljómalind Quarter – Reykjavík
- Laugavegur Street 17–19: apartments and retail space
- Klapparstígur Street 28–30: apartments and restaurant
- Smiðjustígur Street 4: parking garage
- Canopy by Hilton Reykjavík hotel
Laugavegur Street 17 & 19
- 10 apartments and retail space. In-house development project.
- 2016–2018
Klapparstígur Street 30
-
11 apartments together with a restaurant on the ground floor and basement level. In-house development project.
2016–2018
Klapparstígur Street 28
-
4 apartments together with a restaurant on the ground floor and basement level. In-house development project.
2016–2018
Lava Centre – Hvolsvöllur
-
Contract project for a sister company.
2,424 square metres
Volcano exhibition, restaurant, and retail space.
Smiðjustígur Street 4
-
Canopy by Hilton Reykjavík together with a parking garage. Contract project.
2014–2016
Gata sólarinnar – Akureyri
-
11 high-quality year-round houses by Kjarnaskógur Forest. In-house development project.
2015–2018
Skipagata Street 5 – Akureyri
-
Retail, services, and apartments. In-house development project.
Built on top of an existing building, total size 367 square metres.
Retail and service space on the ground floor, with an extension built at the rear. Renovated apartment on the second floor, with two additional floors added above, containing two apartments.
2014–2015
GMR Steel Smelter
-
Steel smelter at Grundartangi. Contract project.
2013–2014
Hotel Edda Extension
-
Extension to Hotel Edda in Höfn in Hornafjörður. Contract project for a sister company.
2013–2014
Fontana – Laugarvatn
-
New natural bathing pool connected to the existing facilities. Contract project.
2013
Langholtsvegur Street 5 & 9 – Reykjavík
-
Two new buildings, each with three apartments. In-house development project.
Apartment size approximately 90 square metres.
2013
Icelandair Hotel – Akureyri
-
Size: 3,600 square metres
100 rooms
2010–2012
Becromal Factory – Akureyri
-
13,000 square metres
2009
Cabin Hotel
Borgartún Street
- 6,400 square metres
Nýherji
Borgartún Street
- 6,542 square metres
Álftanes
-
90 apartments
42 townhouses
School extension
Preschool at Breiðumýri
Extension to the sports hall
Confederation of Icelandic Enterprise
- 2,920 square metres
Úrval Útsýn
Lágmúla
- 2,174 square metres
Smáratorg
- Retail centre
